понедельник, 1 июня 2020 г.

The Cardinal Change Doctrine

The cardinal change doctrine limits the ability to make significant changes to a project’s scope of work after the contract is signed. This doctrine prevents a contractor or sub from having to perform work that wasn’t initially bargained for.

The ability to identify cardinal changes is an important tool for contractors and subs to protect their rights and ensure they get paid what they’ve earned. Without knowing what is and isn’t allowable, construction businesses can’t be empowered to stand up for themselves when they’re getting yanked around. The cardinal change doctrine grants construction businesses a way out when confronted with a cardinal change.

https://www.levelset.com/blog/cardinal-change-doctrine/